How to price a cargo survey: marine surveyor rates explained
Cargo surveys are paid per ton, not per hour. How a surveyor builds a rate: per ton, day rate or fixed fee, waiting time, pass-through costs, what to agree.
Operium Solutions · Updated 30 September 2026 · 6 min read
A cargo survey is paid per ton, not per hour. How fast a ship works decides the hours on site, not the size of the job, so the rate is built from the yearly cost of running your business plus the income you need, divided by the tons you expect to survey (or, for work outside the tonnage, the days you can really bill), then the items that vary per job are added. Waiting time and out-of-hours work get a stated rate of their own. We found no primary source that publishes market rates for cargo surveys, so this article teaches the method and quotes no amounts.
Who you are pricing for
The price is agreed with the party that appoints you. FOSFA notes that the seller of the commodity appoints the superintendent and pays the bill. Contracts then allocate some costs between buyer and seller. Gafta No. 100, for example, puts weighing at discharge at the buyer's expense and a final loading weight certificate from an approved superintendent at the seller's choice and expense (clause 15). Those clauses decide who bears the cost between the parties. They do not change who owes you the fee. Agree it with whoever instructs you, and read what an independent cargo surveyor does for how appointments work.
Per ton, day rate, fixed fee or both
- Per ton. The usual basis for a cargo survey. It follows the size of the cargo, not the speed of the ship: fast ships give few hours, and a company paid by the hour would not earn enough from them. State which tonnage counts, for example the bill of lading weight or the outturn, and the minimum charge per job.
- Day rate. Fits work whose length you do not control. It is simple to explain. Define the length of a day, for example hours on site, and what counts as part of a day.
- Fixed fee per survey. Fits a defined job, such as one draught survey or one sampling on a known vessel. The client knows the price in advance; the risk is yours if the job overruns.
- Both. A fixed fee for the defined scope, plus a stated hourly or daily charge for waiting, delays and work outside the agreed window. This is the structure that most needs writing down.
Building the day rate
Start from the fixed costs of staying in business. A per-ton rate is
rate per ton = (yearly costs + target income) ÷ tons you expect to survey in the year
and a day rate, for work that is not paid by the ton, is
day rate = (yearly costs + target income) ÷ billable days
Billable days are fewer than working days: travel, quotes, reports, training and gaps between jobs are unpaid unless you price them in. The arithmetic below uses fictional currency units, not euros or dollars, and is not a market rate. For a day rate: yearly costs of 20,000 units and a target income of 60,000 units over 100 billable days give (20,000 + 60,000) ÷ 100 = 800 units per day. If only 80 days are billable, the same numbers give 80,000 ÷ 80 = 1,000 units. For a rate per ton, the same 80,000 units over an expected 1,000,000 tons give 0.08 units per ton, and over 800,000 tons 0.10: the fewer tons come in, the more each has to carry.
Costs that belong in the yearly figure:
- Insurance. The Gafta Standard requires adequate and appropriate insurance against liability for operations. ITIC lists typical claim causes: a wrongly described quantity or condition of cargo, and a report sent to the wrong address. Price the cover you can show, not the cheapest.
- Equipment. The Gafta Standard requires a calibration programme for equipment the superintendent owns or controls (section 3.5). Include replacement, calibration and sampling gear.
- Recognition. Some costs are published: Gafta states on-site audits cost GBP 2,100, FOSFA lists the superintendent subscription at GBP 685 a year, and the RvA charges EUR 2,750 a year to an accredited body with no more than three people in accredited activities (2026). Which of them applies depends on your route, described in how to become a GAFTA approved superintendent.
- Training and software, and the time to keep records. The Gafta Standard requires records to be kept for at least seven years.
What goes on the quote
- Travel. Time and costs, and whether travel time is billed.
- Waiting time. Vessels wait. State when the clock starts and stops and the rate; a statement of facts is the evidence (statement of facts).
- Out-of-hours and weekend work. A surcharge stated as a percentage or a rate, agreed before the vessel arrives.
- Sampling and laboratory costs. Decide whether you pass them on at cost, and say so. Analysis is normally a separate appointment: under Gafta No. 100, clause 17, the parties appoint analysts from the Approved Register of Analysts unless otherwise agreed, so the laboratory invoices its own fee. If you advance laboratory or courier costs, list them on the quote at cost (sampling receipt and cargo sampling).
- Report time. The report is part of the work. Price the hours to write and check it, and say how many reports or copies are included.
- A second superintendent. Under Gafta Sampling Rules 4.2, the extra expenses of calling in another superintendent fall on the party that did not attend or refused to draw samples. That allocation is between the parties, so make your own terms say what happens to your fee if a job is cancelled or a party does not show.
What to put in writing before you accept
ITIC's claims experience points at the same gaps every time.
- The scope. ITIC describes a surveyor engaged to report on stevedoring damage whose client's e-mail instructions could be read more widely; the claim was rejected, but a settlement contribution of about 10% of the amount claimed was still agreed, and ITIC's conclusion is that if the brief is restricted to a specific task, it must be clearly recorded. In another case ITIC notes that there was no document specifying what the consultants had been engaged to do, and that many disputes would be avoided if the scope were defined beforehand.
- Precise instructions. Gafta Sampling Rules make the parties responsible for giving their appointed superintendents precise instructions (rule 4.1). Ask for them in writing.
- Your standard terms, incorporated. ITIC publishes draft standard terms for surveyors and warns that terms on a website do not form part of your contract unless you incorporate them in it. Have a lawyer check whatever you adopt.
- Who is the client and who pays, with payment terms.
- Charges for waiting, out-of-hours work and cancellation, and what is passed on at cost.
Based on the working practice of our sector specialist: 25 years in the port, 20 of them as a cargo surveyor. A ship works at its own speed, so a company that is paid by the hour cannot plan on a year of fast ships; tonnage is the stable basis.
General advice: confirm every nomination by e-mail in five lines before the vessel berths: what you will do, for whom, at what rate, what is extra, and which terms apply. A one-page answer beats a good memory.
Run your survey company on FOSS
Quoting well is half the job; the other half is recording the hours. FOSS, the Field Operational Services System, covers a job from nomination to certificate: offline entry on board, built-in calculation methods as used in the sector, document generation in your own house style, a client portal where your client sees nomination, progress and documents, and an audit log of who entered which value. Run your survey company on FOSS, or get in touch.
Frequently asked questions
Is a cargo survey paid per ton or per hour?
Per ton. In the trade a survey is paid per ton of cargo, not per hour, because the number of hours depends on how fast the ship works, not on the job. A year of fast ships would mean few hours and too little income to keep a company running if you billed by the hour. Waiting time and out-of-hours work are the exceptions and are agreed separately.
What is a normal day rate for a marine or cargo surveyor?
We found no primary source that publishes market rates for cargo surveys, and rates differ by country, cargo and the kind of client, so this article gives no figure. The reliable way is to build your own: your yearly costs plus the income you need, divided by the days you can actually bill.
Should I charge per ton, a day rate or a fixed fee per survey?
Per ton is the usual basis for a cargo survey, with a stated charge for waiting and out-of-hours work. A fixed fee suits a job with a clear scope, such as one sampling or one draught survey on a known vessel. A day rate suits work where the duration is outside your control. Many surveyors combine the two: a fixed fee for the defined scope and a stated hourly or daily charge for waiting time and out-of-hours work.
Who pays the surveyor on a trade contract?
The party that appoints the surveyor, unless the contract says otherwise. FOSFA notes that the seller of the commodity appoints the superintendent and pays the bill. Contracts then allocate some costs between buyer and seller, for example weighing at discharge under Gafta No. 100, but that is between the parties, not a reason to change your invoice.
What should be in writing before I accept a nomination?
The scope of work, who the client is and who pays, the standard terms that apply, the instructions received, charges for waiting and out-of-hours work, and what is passed on at cost. ITIC stresses that standard terms only protect you if they are incorporated in the contract with the client, and that a clearly recorded scope avoids disputes.
Further reading
Sources
- ITIC, The Wire 2017: marine surveyors, cases on the scope of instructions and ITIC's Standard Terms and Conditions for surveyors and consultants, including guidance on incorporating them (2017) — https://www.itic-insure.com/fileadmin/uploads/itic/Documents/Marine_surveying_wire_2017.pdf
- ITIC, Marine surveyors: risks, standard terms and indemnity wordings (consulted 30 September 2026) — https://www.itic-insure.com/our-cover/marine/marine-surveyors/
- FOSFA International, Member Superintendents Scheme (consulted 30 September 2026) — https://www.fosfa.org/technical/member-superintendents-scheme/
- Gafta, Contract No. 100, clauses 15 and 17, effective 1 July 2026 (2026) — https://www.gafta.com/media/4iqjltba/100_2026.pdf
- Gafta, Sampling Rules No. 124, rules 4.1 and 4.2, effective for contracts dated from 1 July 2026 (2026) — https://www.gafta.com/media/5qynr511/124_2026.pdf
- Gafta, The Gafta Standard for Supervision, Sampling and Check Weighing, version 7.0 (2019): sections on equipment, insurance and record keeping — https://www.gafta.com/media/0cljjtmi/gafta_standard_for_superintendents_guide_web.pdf
- Gafta, Approved Registers: on-site audits cost GBP 2,100 (consulted 30 September 2026) — https://www.gafta.com/approved-registers/
- FOSFA International, Subscription fees: superintendent member GBP 685 a year (consulted 30 September 2026) — https://www.fosfa.org/membership/subscriptions/
- Raad voor Accreditatie, Tarievenbesluit 2026: annual fee EUR 2,750 for a body with no more than three people in accredited activities (15 December 2025) — https://www.rva.nl/wp-content/uploads/2025/12/D001-NL-16122025.pdf